首页 应用案例 Transportation Slope Monitoring and Early Warning Project in Hangxinjing Expressway
  • 项目名称
    Slope Monitoring and Early Warning Project in Hangxinjing Expressway
  • Project Background
    The high slope of the Qili connecting line of the Hangxinjing Expressway was excavated in 2014, and during construction, parts of the mountain road had through-type slipping, posing a significant safety risk.
     Project Background
  • Project Solution
    Through the construction of the integrated monitoring system for bridges, tunnels and slopes, data monitoring, diagnostic analysis and reporting were carried out. A total of 63 monitoring points were arranged on site to realize all-weather automatic professional monitoring.
  • Project Outcomes
    The high slope of the Qili connecting line is a large-scale slope in Zhejiang Province, featuring a comprehensive automated monitoring system with advanced monitoring technology, making it highly representative in Zhejiang Province. Since monitoring began in December, 2015, the stable output of monitoring data has effectively reduced the cost of management and verified the effectiveness of the management measures.
需要帮助? 我们为您提供解决方案

400-119-1899

7×24小时服务热线

公司地址

杭州市余杭区五常街道绮颐弄53号鲁尔物联总部园区

关注鲁尔物联

鲁尔物联

关注公众号

RUHRloT

Copyright © 2026 杭州鲁尔物联科技有限公司 All Right Reserved 浙公网安备33011002013032号 浙ICP备13032182号-1 网站地图