首页 应用案例 Transportation Bridge Monitoring Project in Xiaoshan
  • 项目名称
    Bridge Monitoring Project in Xiaoshan
  • Project Background
    During the Fengqing Avenue reconstruction, some bridge pile foundations traverse extensive karst-developed areas. Post-construction, vehicle loads may reduce pile-end bearing capacity, causing deformation, settlement, tilting, or even collapse of piers, jeopardizing bridge safety.
     Project Background
  • Project Solution
    Using visual deformation instrument, dual-axis inclinometers, and draw-wire displacement sensors, the project monitors pier settlement, tilt, and ramp lateral displacement across nine viaduct sections in karst areas. A smart bridge safety monitoring platform enables real-time disease detection, early warning, and comprehensive risk analysis.
  • Project Outcomes
    By real-time monitoring of bridge structural safety in karst areas, the project comprehensively captures disease information, identifies anomalies promptly, and issues risk warnings. This effectively prevents hazards like settlement, tilting, or collapse, ensuring the safe operation of viaducts.
需要帮助? 我们为您提供解决方案

400-119-1899

7×24小时服务热线

公司地址

杭州市余杭区五常街道绮颐弄53号鲁尔物联总部园区

关注鲁尔物联

鲁尔物联

关注公众号

RUHRloT

Copyright © 2026 杭州鲁尔物联科技有限公司 All Right Reserved 浙公网安备33011002013032号 浙ICP备13032182号-1 网站地图