  • Project Background
    The bridge was constructed in 2005 and has been in service for 17 years up to now. It is located near a cement plant, where hundreds of concrete mixer trucks pass over it daily. These heavy vehicles typically weigh up to several dozen tons, and their repeated crossings cause irreversible damage to the bridge structure.
     Project Background
  • Project Solution
    As the bridge’s service life increases, its structural stiffness decreases. There is a need for focused monitoring of both the dynamic and static deflections of the bridge. Visual strain monitoring systems should be installed at the bridge piers. Real-time monitoring should also be conducted at 1/4 and 1/2 span locations to measure the real-time dynamic and static deflection conditions.
  • Project Outcomes
    Since the implementation of the project, the data has remained stable. The system can accurately capture fluctuations in bridge data when heavy vehicles pass by. Based on the dynamic and static deflection indicators, it has been observed that the bridge exhibits signs of aging.
需要帮助? 我们为您提供解决方案

400-119-1899

7×24小时服务热线

公司地址

杭州市余杭区五常街道绮颐弄53号鲁尔物联总部园区

关注鲁尔物联

鲁尔物联

关注公众号

RUHRloT

Copyright © 2026 杭州鲁尔物联科技有限公司 All Right Reserved 浙公网安备33011002013032号 浙ICP备13032182号-1 网站地图